ULTRAGUARDโข in Switzerland
๐ฅ The Jonction Autoroutière du Grand-Saconnex, JAG, project in Geneva ๐จ๐ญ, started in 2017. It is the largest construction site in Switzerland at the moment. It is a crucial node in the Geneva Road Network, at the centre of exchanges between the city, the international airport, the UN, the Lake Geneva region and the cross-border regions of neighbouring France.
๏ธ The JAG project in figures: 240 MCHF invested in studies and works (including 16 engineering structures), 5 years of works, 180 million vehicles in transit 3 new bridges including the first cable-stayed bridge in Geneva.
The COLAS SUISSE group is in charge of traffic management on the JAG and CITEC company is in charge of site supervision and local management of the works. ๐ง
It is on this OFROU/ASTRA (Swiss Federal Roads Office) network ๐จ๐ญ that SOLOSAR was entrusted by the COLAS Group with the installation of its innovative safety solution: ULTRAGUARD™. ๐๐ฎ๐ซ ๐ญ๐๐๐ฆ ๐๐ฉ๐ฉ๐ฅ๐ข๐๐ ๐๐ซ๐จ๐ฎ๐ง๐ ๐๐๐ ๐ฆ๐ฅ ๐จ๐ ๐๐๐๐๐๐๐๐๐๐™ ๐จ๐ง ๐ญ๐๐ฆ๐ฉ๐จ๐ซ๐๐ซ๐ฒ ๐ฌ๐๐๐๐ญ๐ฒ ๐๐จ๐ง๐๐ซ๐๐ญ๐ ๐๐๐ซ๐ซ๐ข๐๐ซ๐ฌ ๐๐๐๐๐ ๐๐ซ๐จ๐ฆ ๐๐๐๐๐๐.
ULTRAGUARD™ is a ๐๐จ๐๐ญ๐ข๐ง๐ ๐ญ๐ก๐๐ญ ๐๐จ๐ฆ๐๐ข๐ง๐๐ฌ ๐ ๐ฌ๐ฉ๐๐๐ข๐๐ฅ๐ฅ๐ฒ ๐๐จ๐ซ๐ฆ๐ฎ๐ฅ๐๐ญ๐๐ ๐ฐ๐๐ญ๐๐ซ-๐๐๐ฌ๐๐ ๐ฉ๐๐ข๐ง๐ญ ๐ฐ๐ข๐ญ๐ก ๐ก๐ข๐ ๐ก ๐ซ๐๐๐ซ๐๐๐ญ๐ข๐ฏ๐ ๐ฉ๐จ๐ฐ๐๐ซ ๐ ๐ฅ๐๐ฌ๐ฌ ๐ฆ๐ข๐๐ซ๐จ๐๐๐๐๐ฌ ๐๐ฉ๐ฉ๐ฅ๐ข๐๐ ๐ฏ๐๐ซ๐ญ๐ข๐๐๐ฅ๐ฅ๐ฒ ๐ญ๐จ ๐๐ง๐ฒ ๐ญ๐ฒ๐ฉ๐ ๐จ๐ ๐ฏ๐๐ก๐ข๐๐ฅ๐ ๐ซ๐๐ฌ๐ญ๐ซ๐๐ข๐ง๐ญ ๐ฌ๐ฒ๐ฌ๐ญ๐๐ฆ.
ULTRAGUARD™ actively guides the driver through changes in direction or curves without electrical power, in all weather conditions and especially at night, as it allows for better driver anticipation and reaction thanks to a full view of the road geometry. ๐
A big thank you to our partner COLAS SUISSE for its trust ๐
๐ฝ ๐๐ข๐ฌ๐๐จ๐ฏ๐๐ซ ๐ข๐ง ๐ฏ๐ข๐๐๐จ the ULTRAGUARD™ application on the JAG site in Switzerland